; Standard Drawings - Pedestrian Bicycle Facilities - City of Wanneroo
Menu
Language

Variation to Prohibited Burning Period - Extended 1 April - 14 April 2025

Due to seasonal conditions, the City of Wanneroo has extended its Prohibited Burning Period until 14 April 2025 inclusive. No Permits to burn will be issued prior to this date.

Home

Standard Drawings - Pedestrian Bicycle Facilities

Access Lanes Pathways, Bollards And Reflective Tape (TS09-5-1)

  • File type: PDF
  • Size: 164.97 KB

Concrete Pathway Construction Joint Detail (TS09-3-4)

  • File type: PDF
  • Size: 126.5 KB

Cycle Exit And Entry Ramps (TS09-8-1)

  • File type: PDF
  • Size: 137.11 KB

Foothpaths Layouts For Distributor And Local Roads (TS09-1-2)

  • File type: PDF
  • Size: 170.88 KB

Handrail In Median Island, Verge and Public Access Ways (TS09-6-1)

  • File type: PDF
  • Size: 253.03 KB

Shared Use Pathway Layout For Arterial Roads Functions And Busbays (TS09-2-1)

  • File type: PDF
  • Size: 162.69 KB

Shared Use Path Layout for Public Access Ways (TS09-4-1)

  • File type: PDF
  • Size: 185.19 KB

Tactile Ground Surface Indicators Description Line 2 (TS09-7-4)

  • File type: PDF
  • Size: 197.82 KB